首页 > 留学知识库

问题: 论文摘要求翻译

帮我把论文摘要翻译下,谢谢了:
本文以上汽通用五菱汽车股份有限公司(简称SGMW)制造系统生产车间为背景,主要运用5S,业务计划实施(BPD),精益生产,执行力,区域责任制,团队建设等管理手段对目前SGMW车间现场管理进行剖析,探讨汽车生产制造管理的核心:车间现场管理的改进。全文贯穿车间管理三角形作为指导理论。

解答:

In this paper, more than steam-GM-Wuling Automobile Co., Ltd. (hereinafter referred to SGMW) production workshop for manufacturing systems background, the main application of 5S, the implementation of business plans (BPD), lean manufacturing, implementation, and regional accountability, management tools, such as team-building on the current SGMW management workshop to analyze the scene to explore the management of auto production: the workshop to improve site management. The full text of the triangle through the shop-floor management theory as a guide.